two thirds of christmas comforter

I’m almost there… I missed last week post, and I have a very simple reason for that. I didn’t have time to knit that thing…

I worked on one of my Christmas gifts. As always, I’m short on time. I’m thinking if the “lace shawl workshop” is done, then I’ll have more time for Christmas stuff.

There will be entirely separate post about what I’m knitting for Christmas gifts. And I would like to knit something for fun too. Something that’s not my pattern…

Anyway, as soon as I turned my back to my Christmas blanket to help my kid with school stuff, here he was…

…quality control…

Quality control of Pattern Duchess

Never miss a post or a pattern

Subscribe to get the latest + some extra

Powered by ConvertKit
Make sure you'll check the SHOP section to see what's new!
(Visited 62 times, 1 visits today)

2 thoughts on “Big Project Monday – Over Half Done

  • 21. November 2016 at 19:39
    Permalink

    Ah he’s just testing it for quality control. He says “it’s comfy so it passes”

    Reply
  • 21. November 2016 at 21:40
    Permalink

    It’s looking very good and your quality control cat seems well pleased with it.

    Reply

Leave a Reply

%d bloggers like this: